<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet type="text/xsl" href="http://forums.method.me/cs/utility/FeedStylesheets/rss.xsl" media="screen"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:wfw="http://wellformedweb.org/CommentAPI/"><channel><title>Method:Classic Professional Services</title><link>http://forums.method.me/cs/forums/18.aspx</link><description>Let us know about bugs, error messages, annoyances and ways we can make the app lovable!</description><dc:language>en</dc:language><generator>CommunityServer 2007.1 SP2 (Build: 31113.47)</generator><item><title>Re: Billable time not posting to QB from PS</title><link>http://forums.method.me/cs/forums/thread/10895.aspx</link><pubDate>Thu, 23 Feb 2012 17:20:02 GMT</pubDate><guid isPermaLink="false">3393c1ec-311b-4812-96cb-ad8c611bba4f:10895</guid><dc:creator>Method_Valbon</dc:creator><slash:comments>0</slash:comments><comments>http://forums.method.me/cs/forums/thread/10895.aspx</comments><wfw:commentRss>http://forums.method.me/cs/forums/commentrss.aspx?SectionID=18&amp;PostID=10895</wfw:commentRss><description>&lt;p&gt;Hi Jemel,&lt;/p&gt;
&lt;p&gt;Any Time Tracking entries associated with a budget/contract are held within Method until that portion of the contract is invoiced. This is the way the app currently works and we do this to help enforce budget/contract rules or preferences that have been set in Method regarding the line charge types. &lt;/p&gt;
&lt;p&gt;Example, if you agree to bill by the hour up to a max (ceiling) of 10 hours there would be no way to monitor or split time tracking entries if this was not the case. There would also be no way to prevent time entered directly from QB from being added to an invoice and going above your set max of time.&lt;/p&gt;
&lt;p&gt;We&amp;#39;ll look into if and how the app can accommodate this in the future but I would not expect it in the near future. You are more than welcome to customize the app and remove any actions that hold the time tracking (IsWaitForSyncApproval) on the Method side if you require it to show in QB before being invoiced. &lt;/p&gt;
&lt;p&gt;Hope this helps.&lt;/p&gt;</description></item><item><title>Billable time not posting to QB from PS</title><link>http://forums.method.me/cs/forums/thread/10890.aspx</link><pubDate>Thu, 23 Feb 2012 16:06:40 GMT</pubDate><guid isPermaLink="false">3393c1ec-311b-4812-96cb-ad8c611bba4f:10890</guid><dc:creator>info@jemelsmith.com</dc:creator><slash:comments>0</slash:comments><comments>http://forums.method.me/cs/forums/thread/10890.aspx</comments><wfw:commentRss>http://forums.method.me/cs/forums/commentrss.aspx?SectionID=18&amp;PostID=10890</wfw:commentRss><description>&lt;p&gt;I have posted time worked on a budget/contract in PS. &amp;nbsp;However, the time sheets are not flowing into QB? &amp;nbsp;Most of the contracts are based on a fixed rate. &amp;nbsp;However, for job costing purposes, we&amp;#39;d like to assign the time spent on each budget or contract. What changes do I need to make to ensure the billable and non billable time flows into QB time sheets.&lt;/p&gt;
&lt;p&gt;&amp;nbsp;&lt;/p&gt;
&lt;p&gt;Thank you,&lt;/p&gt;
&lt;p&gt;Jemel Smith&lt;br /&gt;&lt;br /&gt;
info@bottomlinetaxservices.com
&amp;nbsp;
(770) 459-1051 fax. (888) 851-1052
&lt;a href="http://www.bottomlinetaxservices.com/"&gt;http://www.bottomlinetaxservices.com&lt;/a&gt;
&amp;nbsp;
blog. &lt;a href="http://www.bottomlinetaxservices.com/Blog/"&gt;http://www.bottomlinetaxservices.com/Blog/&lt;/a&gt;
twitter. &lt;a href="http://twitter.com/bottomlinetax"&gt;http://twitter.com/bottomlinetax&lt;/a&gt;
facebook. &lt;a href="http://www.facebook.com/bottomlinetax"&gt;http://www.facebook.com/bottomlinetax&lt;/a&gt;
linkedin. &lt;a href="http://www.linkedin.com/in/jemelsmith"&gt;http://www.linkedin.com/in/jemelsmith&lt;/a&gt;&amp;nbsp;&lt;/p&gt;</description></item></channel></rss>