Method Community

 

Search

Page 2316 of 2510 (25093 items) « First ... < Previous 2314 2315 2316 2317 2318 Next > ... Last »
  • Re: Filter Reports for Multiple Classes

    &nbsp;Hello Claire, You can run scheduled QuickBooks reports in Method. Please review the following post and let me know if you are able to find the QB report you are looking for: http://www.methodintegration.com/cs/forums/p/565/1873.aspx#1873 Keep me posted ;)
    Posted to Method:Classic General Q&A (Forum) by Anonymous on 03-11-2010
  • Re: Dates are off by one day?

    &nbsp;Hi Garry, This should be working properly for you, can you kindly test it and let me know? You may want to restart your computer and then try it out. Keep me posted.
    Posted to Method:Classic General Q&A (Forum) by Anonymous on 03-11-2010
  • Filter Reports for Multiple Classes

    &nbsp; Hello... I would like to have a scheduled report filter by multiple classes as I can do in Quickbooks.&nbsp; Is this possible?&nbsp; The classes are unrelated, i.e. they do not have the same parent (so the &quot;include subclasses&quot; option will not work for what I need). Thanks, Claire &nbsp;
    Posted to Method:Classic General Q&A (Forum) by claire.bemus on 03-10-2010
  • Re: Importing into Method from Excel

    &nbsp;Hey Everyone, Joe contacted us to get this issue resolved. It looked like Joe needed to reinstall the Software Development Tools again. The error he was getting needed to be passed through these tools so we could find out what the actual problem was. Once the tools are installed correctly he will be able to understand the error and find ...
    Posted to Method:Classic General Q&A (Forum) by Anonymous on 03-10-2010
  • Importing into Method from Excel

    I&#39;m attempting to import into Method from an Excel spreadsheet. I downloaded the utility and watched the webinar that Ryan presented. I&#39;m getting an error message that there is an unknown library or catalog. I&#39;m using Windows Vista with Office 2007. When I attempt to install Soap Type Library 3.0 from the Microsoft site I see that ...
    Posted to Method:Classic General Q&A (Forum) by Joe Woodard on 03-10-2010
  • Re: Off to a bad start

    Steven emailed with the following reply: OK. &nbsp;I used hourly, thinking I would get an estimated Contract Amount. &nbsp;What&#39;s the definition of Charge Qty by the way? &nbsp; I&#39;m going to start over and use the exact example in the tutorial, since I am really struggling with using my own. &nbsp;Is it necessary to have an Activity ...
  • Suggestion for PS

    I am suggesting that&nbsp;the use of projects and phases just stay on the Method side.&nbsp; Right now, if you set up a project in Method it becomes a job&nbsp;on the QuickBooks side.&nbsp; Unfortunately, we have list&nbsp;limitations in Quickbooks. If I create a project for my team to work on, I don&#39;t&nbsp;want it to show up as a job in ...
  • Re: Off to a bad start

    Hi, Let&rsquo;s see if I can help get things moving. When you added the new project what Contact Type did you specify?&nbsp; The example I used in my Tutorial was a Fixed contract. If I were to use Hourly as an example, it would not update the Contact Amount because it&rsquo;s unlikely there was actual time / Charge Qty entered at the time the ...
  • Re: Calendars off one hour

    calendar is fine as of 11am . thanks for the fast service!!!!
  • Off to a bad start

    I&#39;m afraid I am off to a bad start with this Beta.&nbsp; I decided to walk through the Tutorial in the Quick&nbsp;Start Guide using as a sample a project I just started working on.&nbsp; I entered a new project in step 2 and input &quot;3&quot; as an&nbsp;Est Qty, $75 as a rate, and when I clicked &quot;Update&quot; nothing happened. ...
Page 2316 of 2510 (25093 items) « First ... < Previous 2314 2315 2316 2317 2318 Next > ... Last »