Method Community

 

Scheduling and Invoicing

Last post 03-16-2012 3:23 PM by Method_Valbon. 3 replies.
Page 1 of 1 (4 items)
Sort Posts: Previous Next
  • 03-16-2012 12:56 PM

    Scheduling and Invoicing

     Within the scheduling and invoice tab, when I put create a work order with a specific date, it will not allow me to refresh my screen to a specific time frame. 

  • 03-16-2012 1:38 PM In reply to

    Re: Scheduling and Invoicing

    cmogletree,

    Do you mind providing the steps you are taking? What exactly do you mean by "will not allow me to refresh my screen to a specific time frame."?

    Need more help? Ask us about Method consulting services.

    Valbon Shabani
    Director of Education
    Method Integration Inc.
    Toll Free: 1.888.925.6238 ext. 715
    Local and overseas: 416.847.0400 ext. 715
    Fax: 416.640.6027
    E-mail: valbon@method.me
    Website: http://www.linkedin.com/in/valbon
  • 03-16-2012 1:47 PM In reply to

    Re: Scheduling and Invoicing

     When I select the work order list tab, in existing workorders, I see two date boxes at the top.  The boxes say "to date", and "from date", when I select my dates and hit the refresh screen nothing happens. 

  • 03-16-2012 3:23 PM In reply to

    Re: Scheduling and Invoicing

    cmogletree,

    Make sure that the grids filter view is set to a view that indicates its actually using those dates. One example is 'My occurrences in date rage' and another is 'Shared occurrences in date range'.

    Basically the grid respects the filter applied to the grid and/or filter views. Maybe nothing is changing because there's no work orders that meet the new criteria?

    Need more help? Ask us about Method consulting services.

    Valbon Shabani
    Director of Education
    Method Integration Inc.
    Toll Free: 1.888.925.6238 ext. 715
    Local and overseas: 416.847.0400 ext. 715
    Fax: 416.640.6027
    E-mail: valbon@method.me
    Website: http://www.linkedin.com/in/valbon
Page 1 of 1 (4 items)